HYDROLOGY & HYDRAULIC / WATER RESOURCES ENGINEERING
Featured Projects
> Services
Cadangan Kajian Dan Rekabentuk Tebatan Banjir Di Jalan Labis 65, Jalan Goh Hock Huat Dan Jalan Pasar, Pusat Bandar Klang Utara Untuk Majlis Pembandaran Klang (MPK)

Year Commence:
October 2016
Client:
Majlis Perbandaran Klang
Project Status:
In Progress
Description:
Frequent flooding in Jalan Labis 65, Jalan Goh Hock Huat and Jalan Pasar, Klang town has led the State Government of Selangor through Majlis Perbandaran Klang (MPK) to call upon consultancy services of flood mitigation projects.
Based on the ‘Stormwater Management and Drainage Masterplan Study for the Town of Klang’, the three (3) aforementioned locations is situated in Sg. Binjai catchment where a drainage area of about 1118 ha with 9 tidal gates at river distances varying from 18.8km to 23.8 km. The catchment is urbanised in the eastern section which form the Central Business District (CBD) of Klang.